2017 Contractor of the Year

2017 Contractor of the Year

More than 900 guests attended NAIOP’s 2017 Chicago Awards for Excellence event and dinner at Navy Pier in November. Attendees cast their votes live throughout the evening, and named McShane Construction Company as the Contractor of the Year. This was NAIOP’s 30th annual award event, and the sixth time that McShane has been recipient of this honor (the firm has previously won in 2007, 2008, 2009, 2010 and 2015).

McShane Completes Second DO & CO Facility Near LAX

Jeffrey A. Raday, President of McShane Construction Company, is pleased to announce that the firm has completed a 69,466-square-foot facility on behalf of DO & CO Catering near Los Angeles International Airport, representing the second assignment completed by the firm on behalf of the Austrian-based catering company. The facility provides first-class, in-flight food services to airlines serving international destinations.

The food and beverage tenant improvement assignment encompassed over 18,000 square feet of commercial kitchen space to facilitate meal preparation for DO & CO’s operations, including multiple freezer and cooler areas, dry storage, produce storage and a bakery. Nearly 12,000 square feet of office space was also completed. The food preparation facility meets FDA food handling and preparation standards and supports both halal and non-halal foods.

“We are delighted to have been selected by DO & CO Catering to complete the sophisticated food preparation building for the Redondo Beach location in California,” remarked Raday. “This is our second project working with this client and we are proud to have produced an additional location in the Southern California market.”

MCA Architects provided the architectural services for this assignment.

Desert Gateway Phase II

McShane Construction Company is pleased to announce that the firm was selected to provide the comprehensive construction services for Phase II of Desert Gateway following the successful completion of Phase I. The multi-building industrial project is underway for a joint venture between Griffin Opportunities and 36th Street Partners.

The second phase of development consists of two rear-load buildings totaling 76,874 square feet. Upon completion at the end of the year, both buildings will offer new Class A amenities within 18 fully-improved tenant suites providing an optimal setting for light industrial and manufacturing users.

Situated within the growing Deer Valley submarket in Northwest Phoenix, Arizona, Desert Gateway has enjoyed sustained interest and leasing activity due in part to its prime location off of West Pinnacle Peak Road, just east of Interstate 17 and north of the Loop 101. The 16-acre site offers easy access to both major highway systems, a major FedEx Distribution Center and a variety of retail and entertainment options.

Phase II of Desert Gateway will be constructed of tilt-up concrete panels providing an attractive yet low maintenance exterior that complements the architectural design of Phase I. The new buildings will each incorporate nine outfitted tenant suites from 2,252 to 7,591 square feet. McShane will complete the interior build-out of open and private offices, breakrooms and restrooms within all 18 suites.

The warehouse component in both buildings will incorporate a 20′ clear height, nine drive-in doors, and an ESFR sprinkler system. The firm will also complete the paving of additional on-site parking for 191 vehicles.

“We are delighted to continue on at Desert Gateway with the award of Phase II,” remarked Jeff Raday, President of McShane Construction Company. “Our familiarity with the project and understanding of our client’s vision and goals, together with our industrial construction expertise, will serve our project team in completing another successful phase at this highly regarded development.”

For information about leasing at Desert Gateway, call (602) 575-2309, email info@desertgatewayaz.com, or visit the property’s website at www.desertgatewayaz.com.

Elan Yorktown Award

Jeffrey A. Raday, PE, President of McShane Construction Company, is pleased to announce that the firm has been selected by Greystar to complete Elan Yorktown – a new luxury apartment community coming to Lombard, Illinois.

The upscale multi-family property is under construction on a six-acre parcel at 50 Yorktown Shopping Center. This premier location benefits from close proximity to The Yorktown Shopping Center and a vast selection of nearby amenities, including easy access to major highways.

Elan Yorktown represents McShane’s second current assignment for Greystar. The firm is simultaneously constructing a 175-unit 55+ active adult residence nearby.

The four-story development will incorporate high-quality wood frame construction finished in a combination of brick veneer, cast stone, fiber cement and longboard siding facade. An attached four-story, 336-car parking garage will be strategically wrapped within the residential component to eliminate visibility and further enhance the contemporary architectural design.

A total of 295 units will be offered in studio, one-, two- and three-bedroom configurations. All residences will incorporate stylish fixtures and finishes that complement the open floorplans, large bathrooms, walk-in closets, full-size washers and dryers and private outdoor balconies or patios.

The well-appointed apartment community will feature four exterior courtyards and numerous tenant amenities situated on the first floor and throughout various outdoor areas. Inside, Elan Yorktown will include a fitness center with separate group fitness wing, golf simulator room, theater room, library, several conference rooms/event spaces, and a large club room with a pool table, central fireplace and full kitchen.

The club room will have direct access to one of the four courtyards where an outdoor swimming pool, bar, grilling stations and furnished cabanas with individual flat screen televisions will be located.

Situated at northeast end of the building within a separate courtyard will be additional grilling stations together with the property’s secure dog park, landscaped pond and walking path spanning the exterior. A third courtyard will feature a unique landscape design with a central fountain and surrounding pathways and landscaping. Lastly, a fully enclosed auto courtyard will serve as a grand entrance at the front of the building incorporating a vehicle roundabout, attractive brick pavers, central water feature and landscaped planters.

“Elan Yorktown will incorporate quality construction, stylish finishes and modern amenities that today’s renters are looking for. We are pleased to serve our client, Greystar, in delivering a valuable new addition to their successful portfolio of properties in Lombard’s robust shopping destination,” Raday stated.

ESG Architects is providing the architectural services for the assignment that is slated for completion in May 2019.

2017 Top Design/Build Firms

The McShane Companies is ranked #69 on Engineering News-Record’s Top Design/Build Firms listing. McShane Construction Company was founded upon the design/build project delivery method and first appeared on ENR’s Top Design/Build Firms rankings in 1998. As a practitioner and early adopter of this delivery method, the firm has grown into one of the premier design/build services providers in the country.

Parkview Apartments Award

Jeffrey A. Raday, PE, President of McShane Construction Company, is pleased to announce that UP Development has selected the firm to complete the new Parkview Apartments in downtown Arlington Heights, Illinois. The seven-story building is under construction on a prominent infill site at the southwest corner of Dunton Avenue and Eastman Street, across from Hancock Square and in close proximity to the Arlington Heights Metra Station.

Parkview Apartments will incorporate 45 residential units, ground-floor retail, integrated parking and various sustainable features meeting NGBS Green Certification. On the exterior, the building will complement the surrounding area with design features that are indicative of classic Chicago architecture utilizing an elegant granite base, masonry and cast stone detailing.

Residences will be located on the upper five floors while the second floor and a portion of the first floor will consist of secured parking for 58 vehicles. Also on the first floor, a total of 1,314 square feet will serve as a retail component.

The property will offer 15 one-, 25 two- and five three-bedroom units serving a mix of individuals and families of all income ranges. Each apartment boasts an open floorplan, quality finishes, in-unit washers and dryers and private outdoor balconies. Tenants will also enjoy a community room and outfitted fitness center.

“McShane Construction is pleased to have been selected by UP Development for the delivery of this new mixed-use project in Arlington Heights. Our expertise and long-standing working relationship with this respected developer will support our client in filling the void of quality mixed-income housing in the area,” stated Raday.

Tinaglia Architects, Inc. is providing the architectural services for Parkview Apartments. Construction is slated for completion in early second quarter 2018.

Park Place Completion

Jeffrey A. Raday, PE, President of McShane Construction Company, is pleased to announce that construction of Park Place has been completed for long-standing and respected client, Brinshore Development.

The multi-building affordable housing development is located on a 4.6-acre site at the intersection of 50th Street and Lawndale Avenue within the West Elsdon, Back of the Yards neighborhood. The property is conveniently positioned less than one mile away from both the Pulaski and Kedzie CTA Orange Line stations providing easy access to numerous amenities, the City of Chicago and Midway International Airport.

Park Place offers a total of 78 rental apartments with 15 one-, 42 two- and 21 three-bedroom floorplans throughout 14 three-story residential buildings. Each residence provides a spacious interior layout with quality finishes and in-unit washers and dryers.

As part of the assignment, McShane transformed an existing building located on the site into fully-featured community space through an extensive renovation program. The stand-alone building features a community room, computer lab, fitness center and on-site management. All sitework for the project including paved roads, alleys, sidewalks and landscaping was also completed by McShane.

The architectural design of Park Place purposefully complements the surrounding neighborhood utilizing masonry and fiber cement together with decorative cast stone custom panels at the entryways. Additionally, the property achieves Energy Star certification through the incorporation of sustainable features such as energy efficient appliances, high insulation windows, permeable pavement and rain gardens.

“We appreciate the opportunity to contribute our extensive experience in high-quality multi-family and affordable housing construction to meet the goals our valued client, Brinshore Development,” stated Raday. “Park Place has successfully revitalized this area of the West Elsdon, Back of the Yards neighborhood by providing quality, attractive and functional housing for individuals and families in need.”

Funding for Park Place was provided by multiple sources, including the City of Chicago. Back of the Yards Neighborhood Council, one of the country’s oldest community organizations, is providing social and programming services for residents. Landon Bone Baker Architect served as the project architect for the assignment.

Corona Crossroads Business Park Completion

Jeffrey A. Raday, PE, President of McShane Construction Company, is pleased to announce the completion of Corona Crossroads Business Park. The industrial park features two Class A, LEED-Silver industrial buildings totaling 222,250 square feet. Building A is a 54,261-square-foot facility with a 28′ clear height, four dock high doors, one ground level door, 52′ x 50′ column spacing, 1,600 amps and parking for 118 vehicles. Building B is 167,987 square feet and includes a 32′ clear height, 11 dock high doors, two ground level doors, 52′ x 50′ column spacing, 3,000 amps and 280 parking spaces.

Both industrial buildings offer two-story offices to-suit, ESFR sprinkler systems, six inch (6”) thick concrete slabs, 2.5% skylights and can accommodate a single or multiple tenant configurations.

“McShane Construction is delighted to deliver this exceptional industrial development within the City of Corona,” remarked Raday. “We are confident that the locational and transportation benefits, coupled with the contemporary design elements offered by new construction, will maximize efficiencies and growth opportunities for tenants that call Corona Crossroads home.”

RGA Architects provided the design services for Corona Crossroads Business Park.

Clybourn 1200 Completion

Jeffrey A. Raday, PE, President of McShane Construction Company, is pleased to announce that the firm has completed an on-time delivery of Clybourn 1200 – a highly anticipated mixed-use development of Brinshore-Michaels.

The 84-unit property is positioned on the corner of Clybourn Avenue and Division Street in the Old Town neighborhood of Chicago, Illinois. The seven-story building, which offers mixed-income housing, is within walking distance to numerous shops, restaurants and entertainment options as well as the CTA Clark/Division Red Line Station. The infill site is also easily accessible to the Kennedy Expressway.

Clybourn 1200 features 17,000 square feet of retail space on the ground floor, a 25,295-square-foot secured indoor parking garage on the second floor, and five floors incorporating 84 mixed-income apartments. The development was designed and constructed integrating numerous sustainable features such as a solar hot water system, low VOC products, permeable pavers and Energy Star lighting and appliances.

The residence was constructed of precast concrete that utilizes a blend of textures and colors adding architectural interest to the prominent corner structure. Sleek aluminum windows with varying mullion designs accent the modern design while steel and glass canopies at the retail and residential entrances emphasize the contemporary lines of the building.

Units are available in studio, one-, two- and three-bedroom layouts. Each apartment is complete with stylish fixtures and finishes together with in-unit washers and dryers, sizable closets and an in-floor radiant heat system.

In addition to thoughtfully configured residences, tenants are offered an array of amenities located throughout the property including a community room, computer lab, party room with a kitchen and fitness center. An elegant roof deck located on the third floor provides outdoor amenity space with comfortable seating, a gas grill and fire place. Unique to Clybourn 1200 is the rooftop vegetable garden for residents to utilize and an apiary, or a bee keeping area.

“Clybourn 1200 has successfully transformed a prominent corner in Chicago’s north side into a dynamic and productive destination benefitting the surrounding community,” remarked Raday. “McShane Construction is honored to have served Brinshore-Michaels in bringing their vision of a mixed-use property that balances quality mixed-income housing and retail to this strategic urban site within the City of Chicago.”

Pappageorge Haymes Partners served as the project architect for this notable mixed-use assignment.

For more information about Clybourn 1200, visit www.clybourn1200.com.

2017 Best Curb Appeal Award

Apex 41, a luxury apartment residence completed by McShane Construction, received the 2017 Best Curb Appeal Award by the Chicagoland Apartment Association. The contemporary residence was constructed in a podium format with a five-story metal-framed residential component atop a two-story, precast concrete parking deck. Residents enjoy a wide selection of amenities within a 3,000-square-foot community clubhouse that features a lounge with full kitchen, fitness center, yoga and fitness on-demand studio, business center and a luxurious resort-style swimming pool located directly outside.

Learn More About Apex 41

Trends Impacting the Cold Storage Construction Climate

With the evolution of consumer behavior, rising labor costs and focus on security and sustainability, we are experiencing numerous trends impacting the cold storage construction industry. Let’s talk about five important factors.

Increased Demand — A key reason we’re seeing growth in demand for temperature controlled facilities is the trend toward fresh refrigerated foods and ready-to-eat frozen foods. People are eating healthier than ever before, but want to minimize the time needed to prepare meals. This has resulted in the need for more facilities that can accommodate fresh or perishable items that need refrigeration or pre-made frozen food that requires freezer components. Given the change in consumer preferences, we are seeing an increase in multi-temperature facilities to serve the growth from ports to last mile applications such as Amazon Fresh.

Growth in Automation — Automation is increasing as a result of several factors, but one in particular can be realized as companies try to increase productivity and efficiency. The state of the labor force is also impacting this push for automation. The once thriving population of production workers is getting older making it harder to fill positions while young people have less interest in entering the warehouse environment. The cost of talent is also being heavily affected by the increase in minimum wage, pension and healthcare costs. As a result, automation is becoming the more affordable and long-term solution.

Focus on Employee Satisfaction — For those employees that are essential to the operation of a cold storage facility, we are seeing a shift in priorities toward employee comfort in order to stay competitive with other companies. Office areas are gaining attention with the use of social areas, collaboration spaces and elaborate break rooms. The use of natural light has also become popular, with clerestory windows being utilized.

Enhanced Security — Efforts have increased to safeguard climate-controlled environments from potential tampering or other malicious actions with food products. Securing a facility not only encompasses the building itself, but employees and visitors as well. Users are implementing high-resolution cameras that identify product-related errors and improve processes, while sophisticated scanning systems are assisting with the vetting of guests and truck drivers.

Sustainability — More of our clients are implementing solar panels, energy management systems, refrigerated trailer plugins, alternative fuels, water reclamation systems and even electric car plugins. Cold storage users are also utilizing CO2 and ammonia-based refrigeration systems, specifically cascade refrigeration. These systems require less ammonia, which is kept outside the building, minimizing the risks of contamination or personal safety.

McShane understands these needs and with over 30 years of experience in the construction of temperature controlled facilities, our clients experience the advantages of working with a skilled team that can deliver an efficient, sustainable and high-quality facility benefiting both short- and long-term business objectives.

Download the Article Here

Apex 41 Completion

Jeffrey A. Raday, PE, President of McShane Construction Company, is pleased to announce the completion of Apex 41, a 181-unit luxury apartment development of GlenStar Properties.

Located on a three-acre site at 2760 South Highland Avenue in Lombard, Illinois, the upscale property is situated across the street from the popular Yorktown Shopping Center mall. This prestigious location offers direct access to numerous shops, restaurants and businesses together with optimal convenience to I-88 and downtown Chicago.

Apex 41 was constructed in a podium format with a five-story metal-framed residential component atop a two-story, 242-vehicle precast concrete parking deck. The complex incorporates a mix of studio, one- and two-bedroom units complete with granite and quartz countertops, stainless steel appliances and in-unit washers and dryers. Each apartment also includes a spacious aluminum balcony for private outdoor space.

Residents enjoy a wide selection of amenities within a 3,000-square-foot community clubhouse that features a lounge with full kitchen, fitness center, yoga and fitness on-demand studio, business center and a luxurious resort-style swimming pool located directly outside. Additional outdoor space is offered within a 16,000-square-foot park-like raised plaza with lush landscaping, gourmet grill stations, fire pits, a putting green and various seating areas.

“The I-88 corridor is home to a number of Fortune 500 companies and continues to attract large businesses making the area an increasingly desirable place to live,” remarked Raday. “Apex 41 provides a much needed rental option to the area’s expanding young workforce who desire the amenities and locational benefits offered by this superior development.”

Stephen Rankin Associates provided the architectural services for Apex 41. Greystar is serving as the exclusive management and leasing team. For more information and leasing inquiries, visit www.liveapex41.com.